The new Ultra Pure Ozone Ballast comes with shorter wires and no electrical terminals that attach to the pc board. This Easy instruction sheet shows how to install the new ballast in a few quick minutes. Please call us if you get stuck and have any questions doing the work. (866) 418-1840 Toll-free.
Step 1:
We’ve removed most of the wires in this control box to make it easier to see what needs to be done.
Step 2:
Turn off power at the GFI! Next, cut the black wire that goes from the ballast to the mother board. Leave about 4-6” of wire so you can attach to the new ballast.
Step 3:
Cut the white wire next. It begins at the white plastic ballast connector and is plugged into the mother board. Leave 4-6” of wire so you can attach to the new ballast.
Step 4:
Separate the old ballast from the ozone generator at the white plastic connector.
Step 5:
Remove the 2 mounting screws and discard the old ballast.
Step 6:
Strip the ends of the black and white wires that are still attached to the mother board, leaving about 1/2” of bare wire.
Step 7:
Using the old screws, install the new ballast. Because the new ballast housing is a little thicker, these screws are just long enough to work. Be patient.
Step 8:
Attach the black wires to each other, and white wires together too, using the blue wire nuts provided in this kit.
Step 9:
Connect the 2 white plastic halves together.
Step 10:
Almost done! Just tuck the wires out of the way so they don’t contact anything on the motherboard. When you turn the GFI breaker on again, the little LED light should glow a soft green to indicate the ozone generator is working.
Please call if you have any questions
(866) 418-1840 toll free in the US